03 / PMS / KANBAN

PMS — Put indicators, trends, on-site inputs and weekly status on the same management workbench; digitalization and then divide deviations into responsibilities, actions, reviews and effect verification. The value of Kanban is to make a real difference after the meeting.

PERFORMANCE / CURRENT CYCLE

Overview of operating status

S

Q

D

C

KPI REVIEW

READY

OPEN ACTIONS

ASSIGNED

RCPS FLOW

ACTIVE

WEEKLY FOCUS

ON TRACK

SAFETYQUALITYDELIVERYCOSTRCPSKAIZENACTION TRACKING

01 / PERFORMANCE MANAGEMENT

SQDC — Not only look at it,
We must also push for the next step.

PMS · Pareto — The real-life interface simultaneously organizes performance indicators, on-site inputs, additional materials, weekly overviews, updates and production plans. Managers can move from results to causes, and teams can move from deviations to actions.

S

SAFETY

safe

Bring event levels, risk inputs, actions and experience feedback into daily management rather than just counting results.

Q

QUALITY

quality

At the same time, you can see the pass rate, defect trends and pending issues, and can continue to trace the causes and actions.

D

DELIVERY

delivery

Discuss plan achievement, output, bottlenecks and production risks within the same time window.

C

COST

cost

Link efficiencies, man-hours, losses and resource inputs to bring cost improvements back to concrete on-site actions.

02 / CONTINUOUS IMPROVEMENT

After seeing the deviation,
A way is needed to close the problem.

Kanban · RCPS · Kaizen — Truthfully distribute problems according to the impact and complexity of resolution, and simultaneously present the responsible person, plan date, in-process preparation, review and effect evaluation to prevent problems from disappearing between meetings and forms.

STEP 01

enter

SQDC — Develop assignable issues from deviations, field incidents, or employee feedback.

STEP 02

Diversion

Just Do It · RCPS · D · Kaizen — Enter, four-step, eight-step, or by business impact and solution complexity.

STEP 03

promote

Clarify the person responsible, planned completion time, required resources and current status.

STEP 04

review

Allow closed questions to enter the effectiveness and process review to avoid just completing the form.

STEP 05

learn

Precipitate effective countermeasures into standards, experience and the next round of prevention inputs.

03 / REAL PRODUCT

Two perspectives,
The same operational closed loop.

PMS · Kanban — Responsible for discovering and interpreting deviations, and The two perspectives share the same management rhythm, forming a closed loop from performance to improvement.

04 / DESIGNED FOR USE

Not big screen decoration,
It is the team's daily workbench.

Goals and reality

Put goals, trends and deviations in the same time frame.

clear responsibilities

Each action has a person responsible, a deadline and a current status.

Meeting rhythm

Adapt to the operating rhythm at different levels of daily, weekly and monthly.

continuous learning

Let the issue of closure become the standard, experience and next prevention.

START WITH THE REAL PROBLEM

If the problem repeats itself every week,
What is missing may not be another form.

Schedule Project Assessment